Below is a list of our recent projects, listed by date.
| Overview |
Client |
Images |
|
|
|
| Manufacture of concrete moulds and precast |
Procast |
|
|
|
|
| Detail Design fabrication construction of spoil conveyors for the North South bypass tunnel. |
H+E Ligistik GmbH |
|
|
|
|
| The fabrication and construction of an overpass for the Redcliffe High School |
Main Roads Queensland |
|
|
|
|
| Fabrication and construction of 20 metre diameter 30 metre high spoil silos |
Leightons |
|
|
|
|
| Construction of new clinker shed including Civil Concrete Structural Mechanical and electrical works |
Sun State Cement |
|
|
|
|
| Waste Tailings Project Installation of tanks buildings equipment and piping systems. |
Oktedi Mining |
|
|
|
|
| Rotating frames for Lake Lindsay Dragline - Centre / 1st Left & Right / 2nd Left & right. |
Bucyrus AUSTRALIA |
|
|
|
|
| Supply & Fab: Cable Gantry to Captain Cook Bridge |
ENERGEX Limited |
|
|
|
|
| Supply fabricate install and Commission coal conveyors |
Connell Wagner Pty Ltd |
|
|
|
|
| Lihir Floatation Upgrade |
LIHIR MANAGEMENT COMPANY LTD |
|
|
|
|
| Supply and Construction of a 50 metre Diameter High Rate Thickener at Tarong Power Station |
Dorr Oliver Eimco |
|
|
|
|
| Supply and Installation of a 50 metre Diameter Thickener at Tarong Power Station |
Tarong Energy |
|
|
|
|
| Supply and Fabrication of a 50 metre Diameter Thickener at Tarong Power Station |
Tarong Energy |
|
|
|
|
| Upgrade of Heck Sugar Mill Rocky Point Qld |
STANWELL CORPORATION |
|
|
|
|
| Supply and Installation of Converor and transfer stuctures in the ACT |
Boral Construction Materials |
|
|
|
|
| Supply and Installation of Deminerilisation plant ant Tenyson Power Station |
Queensland Electricity Commission |
|
|
|
|
| Upgrade of pumps at Mt Crosby Water treatment plant |
DEPARTMENT OF PUBLIC WORKS |
|
|
|
|
| Design Manufacture and Installation of a new Screening process |
New Hope Collieries |
|
|
|
|
| Manufacture Erection and Painting of Ilmanite Storage Bin at Pinkenbah |
Consolidated Rutile |
|
|
|
|
| Luggage Point Sewage Treatment Handrails and walkways |
DEPARTMENT OF PUBLIC WORKS |
|
|
|
|
| Structures and Conveyors for Mackay Bulk Sugar Terminal |
CSR Sugar |
|
|
|
|
| Superheater Replacement at Bulimba Power Station |
Queensland Oil Seed Crushing |
|
|
|
|
| Supply of Conveyor Gallery for Gladstone Grain Terminal |
GLADSTONE PORT AUTHORITY |
|
|
|
|
| Supply and Installation of 2000mm Pipe line for Gladstone Power Station |
Queensland Electricity Commission |
|
|
|
|
| Supply & Construction of Townsville Bulk Sugar Rail Dump station and Bulk store. |
Mcdonald Wagner and Pridle |
|
|
|
|
| Lucinda Wharf Demolition and reconstruction |
Mcdonald Wagner and Pridle |
|
|
|
|
| Supply of Pre fabricated Steel to Yabulu Area 370 |
Hatch |
|
|
|
|
| Supply of Steel work for the Comalco Alumina Refinery in Gladstone |
Bechtel AUSTRALIA PTY LTD |
|
|
|
|
| Principal Contractor for PGH Oxley Brickworks 58 m Stack Fabricated in components and assembled and erected on site. |
DALRYMPLE BAY COAL TERMINAL PTY LTD |
|
|
|
|
| Nitric Acid Plant Steel Work. |
Orica |
|
|
|
|
| AN2 Plant Structural Steel |
Orica |
|
|
|
|
| Principal Contractor for the Shut down and Replacement of Jellinbah Dump Hopper crusher conveyors and Chutes |
Jellinbah Mining |
|
|
|
|
| Supply of Main Boiler support beams for Kogan Creek Power Station. |
HITACHI |
|
|
|
|
| Manufacture and Erection of a Stainless Steel of Prill Tower and Head House which included process and jacketed piping. |
Orica |
|
|
|
|
| Pre fabrication and erection of Pipe Racks and pipe spools off site and delivered in modules |
Queensland Nickel Pty Ltd |
|
|
|
|
| Supply and erection of Structures for Clean fuels upgrade at Bulwer Island. |
BP Refinery |
|
|
|
|
| Fabrication of Complex Crown steel work for Australia's tallest building |
Sunland Constructions |
|
|
|
|
| Cut and Raise ship to shore crane to accommodate larger ships and relocate 1000T cranes on specialised bearing pads. |
Kone Crane |
|
|
|
|
| Manufacture of Feeder Breakers as required by the Equipment Providers |
OLDENBURG STAMLER |
|
|
|
|
| Porte Cochere Prototype for Q1 retail area |
Sunland Constructions |
|
|
|
|
| Mechanical Upgrade and piping installation for Lihir Island No 2 Grinding Thickener Project |
LIHIR MANAGEMENT COMPANY LTD |
|
|
|
|
| Upgrade of Oakey Abattoirs |
Oakey Abattoirs |
|
|
|
|
| Supply Of Spiral Transport Frames & Misc. Items |
ROCHE MINING (MT) |
|
|
|
|
| Supply of Indooroopilly Bike Bridge |
Moggill Constructions |
|
|
|
|
| On going Manufacture of Rail Wagons. |
Queensland Rail |
|
|
|
|
| Ash Hoppers & Structural Steel for Callide |
SHAW AITON |
|
|
|
|
| Structural for Curragh |
SEDGMAN PTY LTD |
|
|
|
|
| Top Girders for Kogan Creek Boiler House. |
HITACHI |
|
|
|
|
| Principal Contractor Noise Barriers for Sims Metal. |
Sims Metals |
|
|
|
|
| Relocatable Jig Plant Supply and Install |
ROCHE MINING (MT) |
|
|
|
|
| Supply and Install a 38 metre Thickener and associated Process tanks and piping into Lihir Island PNG. |
LIHIR MANAGEMENT COMPANY LTD |
|
|
|
|
| Manufacture and Construction Fume control system at the Boyne Smelter Gladstone |
Hoogovens |
|
|
|
|
| Upgrade of floatation cells for Tritton Copper |
Ausenco |
|
|
|
|
| Principal Contractor for the Detail manufacture and construct 36 metre diameter thickener and upgrade existing floating concentrator . |
Sinclair Knight Merz |
|
|
|
|
| Manufacture and painting of steel structures and conveying systems for the Comalco Aluminum Refinery |
Bechtel AUSTRALIA PTY LTD |
|
|
|
|
| Principal Contractor for the Upgrade of plaster mill including the detailing fabrication and installation of equipment ducting and structures |
Blue Circle Cement |
|
|
|
|
| Principal Contractor for the Egress upgrade of existing tobacco storage facility including demolition and refurbishing of buildings |
Hamon USA |
|
|
|
|
| Supply and installation of steam piping and Distillation piping |
Heck and Sons |
|
|
|
|
| Mt Arther North Coal upgrade. New dump station conveyors and support structures |
Monadelphous |
|
|
|
|
| Demolition Manufacture Design and construct new roof for Lang Park football stadium using state of the Art Construction techniques. |
Nixenco |
|
|
|
|
| Principal Contractor for the Design and construct of 3 16 metre high tanks with associated Access and process piping for QAL Gladstone. |
Hatch |
|
|
|
|
| Fabrication of Stack at Swanbank Power Station |
STORK ICM AUSTRALIA PTY LTD |
|
|
|
|
| Supply and Installation of Turbine Structure and equipment platforms |
Alstom Power Boiler Devision |
|
|
|
|
| Principal Contractor for the Design supply & installation of steelwork and mechanical components for coal sizing and handling plant for Jellinbah Plains project |
Oldenburg Australasia Pty. Ltd |
|
|
|
|
| Supply of steelwork for Fines Recovery Plant |
Comalco Aluminum |
|
|
|
|
| Fabrication and construction of turbine hall for Swanbank E Power Project |
Meateng Pty Ltd |
|
|
|
|
| Supply of Transformer Shells |
ALSTOM transformers |
|
|
|
|
| Principal Contactor for the Supply & Construction of Coal Transfer Station |
Tarong Energy |
|
|
|
|
| Principal Contractor for the Supply fabrication and commissioning including electrical installation of an ash water pumping station at Swanbank Power Station - Ash Water Dam |
CS Energy |
|
|
|
|
| Millmeran Power Station Manufacture off site assembly painting and delivery of boiler house components |
Haven Steel |
|
|
|
|
| Principal Contractor for the Detailing fabrication and construction of conveyor support steel platforms control room and the installation and commissioning of conveyors and equipment. |
AP Morling |
|
|
|
|
| Supply of gas ducts for a 220mw gas fired power station at pelican point in SA. |
Higgott and Kane |
|
|
|
|
| Detailing manufacture painting off site fit out and delivery of a coal handling system for the Millmeran power station. Included the dump station overland conveyor stockpile feed and reclaim conveyors crushing building transfer conveyors trippers |
FMC |
|
|
|
|
| Principal Contractor for the Design and construction of 3 500 m2 warehouse including all civil and construction works. |
SEALY OF AUSTRALIA |
|
|
|
|
| Shut down maintenance of coal fired generation units at Swanbank Tarong and Stanwell power stations including re-tubing of boilers ash hopper refurbishing water seal refurbishing PF pipe replacement water wall repair ball mill overhaul and other. |
CS Energy |
|
|
|
|
| Construction of molasses storage tanks and process piping for the Isis sugar mill in central Queensland. |
CSR Sugar |
|
|
|
|
| Installation of processing plant such as cookers mixers screw conveyors boilers bins and the fabrication and installation of steam and process piping in both carbon and stainless steel |
AJ Bush |
|
|
|
|
| Design and construction of animal by product handling plant including belt conveyors screw conveyors live bottom bins and pneumatic indexing systems. |
DAVIS GELATINE |
|
|
|
|
| Design and construction of prototype plant and relocation of fabric filter plant to Swanbank 'A' power station. |
CS Energy |
|
|
|
|
| Fabrication of conveyors and structural steelwork for Mt Leyshon Gold Mine Charters Towers. |
THIESS PTY LTD |
|
|
|
|
| Principal Contractor for the Turnkey construction of rail workshops at Redbank Queensland |
Queensland Rail |
|
|
|
|
| Fabrication galvanising and delivery of steelwork and conveyors for the Wambo coal washing plant in central NSW. |
Bulk Material Coal Handling |
|
|
|
|
| Disassembly of the existing station and the fabrication and construction including civil works electrical works and all construction on the rail unloading station at Barney Point Gladstone. |
BHP BILLITON |
|
|
|
|
| Fabrication and construction of a 120 mtr high x 4.5 mtr diameter steel tower for a thrill ride called the Tower of Terror at Dreamworld on the Gold Coast. |
Dreamworld |
|
|
|
|
| Fabrication and construction of steelwork plate work conveyors and electrical systems for the deadburn facility expansion at Queensland Magnesias Rockhampton plant. |
Ausenco |
|
|
|
|
| Fabrication and tiling with alumna tiles of all plate work for the Moranbah North coal washing plant in Central Queensland. |
STANWELL CORPORATION |
|
|
|
|
| Fabrication of plant ducting ducting supports and structures for the Oil Shale plant in Gladstone. |
Bechtel AUSTRALIA PTY LTD |
|
|
|
|
| Principal Contractor for the Supply and construction of microcell units filter press conveyor including coal washery modifications piping plate work and structural steelwork |
Bulk Material Coal Handling |
|
|
|
|
| Principal Contractor for the Construction of a Kaolin plant including the supply of structure vessels piping ducting and equipment |
Australian Kaolin |
|
|
|
|
| Principal Contractor for the Relocation and upgrade of mine process facility and dredge. Including the supply of fabricated components. |
Consolidated Rutile |
|
|
|
|
| Principal Contractor for the Design supply and construction of a 3600m2 factory and administration facility. |
Thomas Marsh Springs |
|
|
|
|
| Detail drafting supply fabrication galvanising fire proofing and off site assembly of steelwork for the hydrocracker unit and Co generation plant at BP Australia's Bulwer Island refinery |
BP Australia |
|
|
|
|
| Supply 12mtr by 3mtr inlet ducting for two 210mw gas turbine generators. |
ABB Power |
|
|
|
|
| Detail drafting fabrication painting and delivery of 1600 mts of 5mtr wide by 6mtr high duel level pipe rack |
Kinhill |
|
|
|
|
| Detail drafting fabrication painting and delivery of a 8400m2 phosphate storage building for the Phosphate Hill project in north QLD. |
Kinhill |
|
|
|
|
| Fabrication and construction of 3 200 tone of structural steelwork for the Callide B turbine house structure at the Callide power station in central Queensland. |
CS Energy |
|
|
|
|
| Fabrication of radial gates and associated penstocks fixed wheel gate bulkhead gate and associated lifting structures hydraulic systems and control equipment for the Burdekin Falls Dam. |
DEPARTMENT OF PUBLIC WORKS |
|
|
|
|
| Fabrication and construction of the Cairns international airport terminal building including main building structure elevated walkways and external transport terminals. |
Cairns Port Authority |
|
|
|
|
| Fabrication and construction of 600tone of structural steel for a cyanide chemical plant at Gladstone |
Orica |
|
|
|
|
| Fabrication and Construction of 2000tpa coal stockpiling facility including conveyor tripper transfer towers plate work and system commissioning at the Clinton Coal export facility at Gladstone for Connell Wagner Pty Ltd |
GLADSTONE PORT AUTHORITY |
|
|
|
|
| Principal Contractor Fabrication and Construction of a 1000T Capacity Oil Storage Tank Fabrication and Installation of Stainless Steel Heat Exchanger and Pipe work. Manufacture and installation of drag chain conveyors. |
Queensland Oil Seed Crushing |
|
|
|
|
| Fabrication galvanising and delivery of steelwork and conveyors for the Tahmoor coal washing plant in central NSW. |
Bulk Material Coal Handling |
|
|
|
|
| Fabrication of construction of coal washing sumps launders and processing equipment for the Gordonstone coal mine. |
BHP BILLITON |
|
|
|
|
| Fabrication of chutes tanks and hoppers for the Gordonstone coal washing plant. |
HITACHI |
|
|
|
|
| Fabrication and delivery of 800t of air ducting for the Stanwell power station in central QLD. |
Clyde Babcock Hitachi |
|
|
|
|
| Fabrication and construction including all civil and concrete works for the primary pipe-racks and pipe bridges at Oricas Ammonium Nitrate plant in Gladstone. |
Orica |
|
|
|
|
| Fabricate and construct the ammonium nitrate complex at Gladstone |
Orica |
|
|
|
|
| Fabricate main girders for Stanwell power station. |
Clyde Babcock Hitachi |
|
|
|
|
| Fabricate coal feed and crusher station conveyors for North Goonyella coal mine. |
HUWOOD INTERNATIONAL |
|
|
|
|
| Principal Contractor for the Design and construction of workshop and service bays including hydraulic and fuel lines at Mt Leyshon gold mine |
MULTIPLEX |
|
|
|
|
| Fabrication of conveyor galleries for the Clinton coal stockpiling and ship loading expansion. |
GLADSTONE PORT AUTHORITY |
|
|
|
|
| Fabrication of conveyor galleries for the Clinton coal stockpiling and ship loading expansion. |
GLADSTONE PORT AUTHORITY |
|
|
|
|